Home arrow Image Gallery
 
Lennartz electronic GmbH · Bismarckstrasse 136 · 72072 Tübingen · Germany · Phone: +49-(0)7071-93550, Fax: +49-(0)7071-935530 · info@lennartz-electronic.de
Main Menu
Home
News
Seismometers
CT-EW1 Calibration Table
Dataloggers
Documentation
About Lennartz
The TUBL borehole station
Contact Us
Search
Downloads
Forum
Image Gallery
Impressum / Imprint

 
 
 2008-07-29: Solar power plant officially inaugurated 
Willi Walker showing the Mayor, Mr. Boris Palmer, around the premises. Right: portrait of founder Herbert Lennartz.
Willi Walker showing the Mayor, Mr. Boris Palmer, around the premises. Right: portrait of founder Herbert Lennartz.
Viewed: 1368 times.

Various seismometer models
Various seismometer models
Viewed: 1339 times.

Dieter Stoll and Boris Palmer talking; local TV station listening in
Dieter Stoll and Boris Palmer talking; local TV station listening in
Viewed: 1320 times.

In the printed circuit board assembly lab
In the printed circuit board assembly lab
Viewed: 1344 times.

The most important room on the premises: Sensors are calibrated down here in the basement. The local media take a lively interest in the goings-on.
The most important room on the premises: Sensors are calibrated down here in the basement. The local media take a lively interest in the goings-on.
Viewed: 1370 times.

The small ceremony ends in a short presentation of Lennartz past and present - with special emphasis on the CTBTO large scale field test in Kazakhstan
The small ceremony ends in a short presentation of Lennartz past and present - with special emphasis on the CTBTO large scale field test in Kazakhstan
Viewed: 1278 times.

All done
All done
Viewed: 1304 times.

408 square meters at work - even on a day like this averaging around 8-10 kW
408 square meters at work - even on a day like this averaging around 8-10 kW
Viewed: 1374 times.

Powered by Gallery v1 RSS